If you are having trouble viewing this newsletter, click here.
  Test Drive the new damage prevention model

Underground Understood

Use Underground, Understood to drive home your damage prevention message.

You'll get better mileage from this damage prevention message:

  • It's content is timeless - it doesn't get old after a year
  • Designed to unite the blue collar and white collar sectors of damage prevention through better understanding of the other guy's job
  • Written by staff that is in the trenches and deal with damage prevention every day

Underground, Understood is a visual guide to damage prevention. It doesn't preach to one player in the industry, rather it illustrates the entire damage prevention process and shows some of the obstacles to damage-free excavation.

A new damage prevention model

Underground, Understood creates a model for damage prevention that illustrates the entire damage prevention process.

View the entire magazine (preliminary), or view it by section:

  • INTRODUCTION
  • BEFORE
    SUE, Utility Products, Locating Instruments, Tracer Wire, GPS, Utility Maps, One-Call Centers, Pre-Marking
  • DURING
    Tolerance Zones, Depth Readings, Easement Painting, Locator Audits, Winter Painting, Private Locating, Trench Protection
  • AFTER
    Damages, Disaster Prevention, Damage Investigation, Cost Recovery, As-Builts
Take a test drive of Underground Understood
Call 815-468-7814 to ordr
The Underground is decoded by Underground Understood

   Distributed by Planet Underground Media, LLC Manteno, IL    815-468-7814   underspace.com