
Use Underground, Understood to drive home your damage prevention message.
You'll get better mileage from this damage prevention message:
- It's content is timeless - it doesn't get old after a year
- Designed to unite the blue collar and white collar sectors of damage prevention through better understanding of the other guy's job
- Written by staff that is in the trenches and deal with damage prevention every day
Underground, Understood is a visual guide to damage prevention. It doesn't preach to one player in the industry, rather it illustrates the entire damage prevention process and shows some of the obstacles to damage-free excavation. |
|

Underground, Understood creates a model for damage prevention that illustrates the entire damage prevention process.
View the entire magazine (preliminary), or view it by section:
- INTRODUCTION
- BEFORE
SUE, Utility Products, Locating Instruments, Tracer Wire, GPS, Utility Maps, One-Call Centers, Pre-Marking
- DURING
Tolerance Zones, Depth Readings, Easement Painting, Locator Audits, Winter Painting, Private Locating, Trench Protection
- AFTER
Damages, Disaster Prevention, Damage Investigation, Cost Recovery, As-Builts
 |
|